Everything homeowners ask us before signing a contract. Still stuck? Call (209) 595-0787.
We're based in Ceres and serve Central California — Modesto, Turlock, Manteca, Salida, Riverbank, Oakdale, Patterson, and the surrounding communities.
Call (209) 595-0787 or fill out the form on our contact page. We respond within one business day and estimates are always free.
Chadha Construction Co. Inc. has been building and remodeling in Central California for over 15 years.
Yes. We hold California contractor license #1011497 and carry liability insurance and workers' compensation coverage. You can verify our license directly with the CSLB.
We come to your home, walk the space, take measurements, and talk through what you want. You get a written scope and price — no charge, no obligation.
Yes. When your project requires a permit, we handle submittal, plan check corrections, and meet every inspector on site.
A bathroom runs 3–6 weeks, a kitchen 8–12 weeks, and an addition 4–8 months including design and permitting. Every estimate includes a schedule.
Usually. Tell us the number up front and we'll show you what's achievable and where the trade-offs are, instead of designing something you can't build.
Most full kitchen remodels in Central California land between $30,000 and $100,000 depending on cabinet grade, countertops, and whether walls or plumbing move.
8–12 weeks on site, plus 2–5 weeks up front for design, selections, and permits.
We're not locked to one supplier. We quote stock, semi-custom, and custom options side by side, and you can supply your own appliance package.
Guest baths run $12,000–$22,000. Primary suites with custom tile and glass run $25,000–$45,000.
Usually yes, and keeping fixtures in place saves money. If we find failed supply lines or drain problems, we show you before we go further.
A building permit with electrical, plumbing, and mechanical sub-permits, plus stamped structural plans in most Stanislaus County jurisdictions.
Typically 4–8 months. Plan check is the least predictable part of the schedule.
Composite for low maintenance and Valley sun resistance; redwood for looks and a cooler surface underfoot. We'll show you the 10-year cost of each.
Generally yes if the deck is over 30 inches above grade or attached to the house.
Most re-roofs take 3–6 days including tear-off, sheathing repair, install, and inspection.
We provide documented inspections and itemized scopes carriers accept, and we'll meet your adjuster on site.
Our core crew does the framing, finish, and coordination. Licensed specialty trades handle electrical and plumbing — the same ones on every job, so nobody is learning your house from scratch.
Written change orders with cost and schedule impact, signed before the work happens. Nothing shows up as a surprise on the final invoice.
We warranty our workmanship, and manufacturer warranties on materials pass through to you. Terms are written into every contract.
One point of contact, reachable by phone, plus a weekly written update on what's done and what's next.
Tell us before final payment. We don't consider a job finished until you've walked it with us and signed off on the punch list.
We'll give you a straight answer, even if it's not a yes.